Supply planning
Run a weekly plan with demand, firm orders, MPS, BOM, material receipts, lead times, resource capacity, and actual production. Load the example to see the JSON input structure.
Calculation rules
Supply balances run by item and week. MPS and scheduled receipts are inputs. BOM demand is dated at the parent’s production start. Net requirements use lot-for-lot replenishment. Capacity uses the MPS and suggested replenishment releases. Review overloads before scheduling.
ATP is incremental by receipt interval and deducts firm orders through the next receipt. Negative ATP flags an overcommitment. Backlog is demand carried forward. Plan compliance caps credited actual output at the same item’s weekly MPS.
8D problem solving and CAPA
Record ownership, containment, root cause, corrective actions, verification, prevention, and closure. Import a previously exported case to resume it.
Warehouse snapshot and scenarios
Evaluate slot occupancy and cube use, test an ABC slotting proposal, compare pick sequences, and estimate labour. Distances use an unobstructed Manhattan grid. Use a layout with compatible slots and one stock record per occupied slot.
Returns disposition review
Compare supplied restock, refurbishment, vendor-claim, liquidation and disposal options. Review potential offsets against open purchase orders.
Activity-based emissions
Multiply each activity by a supplied factor in kg CO₂e per matching activity unit. Provide the factor reference and reporting scope for each row.